Swimming Pool Design Development

Swimming Pool Sketch Design Stratford upon Avon

Working alongside CT Planning, we continue to explore preferential development routes to enable the best possible architectural response for this new swimming pool building in Stratford upon Avon.

By moving away from the parameters set by permitted development, the design is now free to respond to the Initial Brief and site context in a more natural way.

As we have explored varying development methodologies, the design of this building has returned close to the initial concept artwork. Retaining elements of an architectural vision that were established prior to the introduction of pragmatic constraints is a positive outcome, as it maintains the governing narrative and design intent.

We now look forward to developing the proposals further during RIBA Stage 4 - Technical Design.

Previous
Previous

Why accurate survey information matters

Next
Next

Listed Building Consent Granted